|
MMRCT Meetings
Mettings in 2009
Meetings in 2008
Meetings in 2007
Meetings in 2006
|
Meetings in 2005
Meetings in 2004
|
|
PCT Meeting Presentations
Please
Note:
Some of the presentations are very large and may take some time to load.
Copies of them are available on CD if you are having trouble loading
them.
For CD copies, please contact us at (508) 968-4678, x2.
(When viewing Power Points or PDF's hit your browser back button to return to this page)
January 13,2010 |
EPA’s Position on
Pyrotechnics at MMR PDF
Remediation &
Investigation Update PDF
J-1 Range
Source Area Update Part II PDF
Pyrotechnics Use
at
Camp Edwards PDF
Fuel Spill – 12 Plume Update PDF PPT |
December 12,2009 |
Fuel Spill – 28 Plume Update PDF PPT
J-2 Range
Environmental Monitoring Update PDF
J-1 Source Area Update.PDF |
October 14,2009 |
Chemical Spill-10 In Situ Chemical Oxidation (ISCO) Pilot Test PPT PDF
|
September 16,2009 |
Textron NRD Settlement at MMR PPT PDF
Land use Control PDF PPT
ROD/Construction Update forAshumet Valley, CS-10 and CS-19 PDF PPT
CS-18 Operable Unit Decision Document PDF PPT
Remedy Selection Plan Western Boundary-Demolition Area2-Northwest Corner PDF
Former K Range Update PDF
Soil Removal and treatment Update PDF |
July 8,2009 |
Ashumet valley Contruction update PPT PDF
Testing of Private Wells, Ponds and Harbors PPT PDF
AFCEE wind turbine Project PPT PDF
GP2 Soil and Groundwater Investigation Report PDF
J1 Range remedial Investigation/ Feasibilty Study Part 1 Groundwater PDF
Former K Range Update PDF
Tungsten Investigation at MMR PDF PPT |
June 10, 2009 |
CS-18/19 Source Area Update PPT PDF
AFCEE 611 POPGRID PDF
CS18-CS19 Proposal Figures PDF
Ashumet Valley Construction Update PPT PDF
|
May 19,2009 |
CS19 Groundwater Proposed Plan Revised Plume Layout PDF PPT
Gun and Mortar Firing Positions Update PDF
L Range Remedial Investigation Feasibility Study PDF
Tungsten Update PDF
Soil removal and Treatment Update PDF
|
|
CS19 Groundwater Proposed Plan PPT PDF
Central Impact Area Update PDF
FS9 Conceptual Alternatives PDF
L Range Soil Update PDF
RDX Plerchlorate Plume MAps and X sections PDF
Textron Work at The J-3 Range PDF
|
|
Wastewater Plume On-going Research and Investigation PPT PDF
CS-18 Update Mar09 MMRCT PDF PPT
Tungsten Overview & Update PDF
L-Range Soil Update PDF
|
February 11, 2009 |
Post-ROD Comunity Involment PDF PPT
Camp Edwards Training Update PDF PPT
2008 Ashumet Pond Update PDF PPT
Construction Update PDF PPT
CS-20 Leading Edge PDF PPT |
January 14, 2009 |
CS-10 Prefered Remedy PDF
Remedial investigation/Feasability study-Northwest corner Western boundry PDF
Demolition Area 2 Remedial Investigation/Feasability study PDF
Northwest Corner Remedial Investigation/Feasability study PDF
Western Boundry Remedial investigation/Feasability study PDF
|
December 10 2008 |
BA4 Arial Picture PPT PDF
Area a Walktrough PDF
BA-4 Removal Action PPT PDF
B4 PicturePPT PDF
Demolition Area 1 removal Action PPT PDF
Wind Turbine Update PPT PDF
FS -28 Update PPT PDF |
November 19,2008 |
CS 10 groundwater proposed plan PPT, PDF
Chemical Spill- 19 update PPT. PDF
Optimization of ground Water Treatment Sytems PPT, PDF
Testing of Private Wells, Ponds, Harbors PPT, PDF
|
October 8, 2008 |
Construction Update 08, 2008 PPT PDF
CS-18 Source Area Update PPT PDF
Remediation ivestigation Update PDF
Camp Edwards Small Arms Range Update PDF
|
September 10, 2008 |
R&IUpdate PPT PDF
CS-19 Update MMRC PPT PDF
Southwest Plumes PCT PPT PDF
Construction Update PPT PDF
CS-4 Opt Scen 1.AVI
CS-20 Opt Scen 1.AVI
FS-29 Opt Scen 1.AVI
CS-21 Opt Scen 1.AVI |
|
July 9 2008 |
CS10LeadingEdgeUpdate PPT PDF
LF1_CS23 Plume Update PPT PDF
Camp Edward Small Arms Range Update: Tango Juliet & Kilo Ranges PPT PDF
South East Ranges Update PPT PDF
Animation 1
Animation 2
AV Update_PCT_Jun 08 PPT PDF
|
|
June 11,2008 |
|
|
May 14, 2008 |
Remediation and Restoration Update PDF
Robotics Technology Demonstration PDF
Demotition Area 1 Groundwater Response Action Annual
Update PDF
PFSA Update Power Point PDF
FTA-2 and LF-2 Updates Power Point PDF
CS-10 Update Power
Point PDF |
| April 09, 2008 |
IAGWSP Overview Power
Point PDF
Preliminary Alternatives Ashumet Valley Focused FS Power
Point PDF
Land Use Controls PDF PPT
|
|
13 February 2008 |
Ashumet Valley FS-PP Feb 08 PCT Power Point PDF
AV2008 Additional Drilling PDF
AVSMB20080129-Fig01 PDF
AVSMB20080129-Fig02 PDF
CS-10 Update Power
Point PDF
FS-28 Update Power
Point PDF
LF-1 Reinjection 13Feb08PCTLF1RW Power Point PDF
Residential Wells, Ponds and Harbors Sampling Update Power Point PDF
CS-19 Soil Removal Power Point PDF
Southwest Plumes Explanation of Significant
Differences Power Point PDF
|
|
November 11, 2007 |
2007 Ashumet Pond Update Power Point PDF
2008 Preview Power
Point PDF
http://www.mmr.org/Community/teams/pct2/meetings.htmCS-10 Southern Trench Update Power Point PDF
CS-19 Update PowerPoint PDF
Ashumet Vally Groundwater Proposed Plan UpdatePowerPoint PDF |
|
September 12, 2007 |
LF-1 Infiltration Gallery
(IG) Flooding PowerPoint PDF
Fuel Spill-1 Update and Optimization PowerPoint PDF
Ashumet Valley Proposed Plan Update PowerPoint PDF
FS-28 Leading Edge Proposed Pipeline and Extraction
Well PowerPoint PDF
Testing of Private Wells; Ponds; Harbors PowerPoint PDF
Southwest Plumes Update Powerpoint PDF |
|
June 13, 2007 |
Ashumet Valley Groundwater
Proposed Plan PowerPoint PDF
Ashumet Valley Transport Modelling PowerPoint PDF
Proposed Plan Ashumet Valley Grounwater Plume - EPA
Concerns PowerPoint PDF
Chemical Spill 10 Groundwater Feasibility Study
& Proposed Plan PowerPoint PDF
Fuel Spill 28 Construction and Monitoring Update PowerPoint PDF
Cape Cod's Billion Dollar Cleanup: The Hydrologic
Story PowerPoint PDF
Testing of Private Wells, Ponds, Harbors PowerPoint PDF |
|
April 11, 2007
|
Wind Turbine Project PowerPoint PDF
Chemical Spill 19 Source and Plume Update PowerPoint PDF
Fule Spill 28 Construction and Monitoring Update PowerPoint PDF
Testing of Private Wells, Ponds and Harbors PowerPoint PDF |
|
March 14, 2007
|
Ashumet Valley Feasibility
Study PowerPoint PDF
Chemical Spill 10 Feasibility Study PowerPoint PDF
Landfill 1 VA Cemetery PowerPoint PDF
Chemical Spill 10 Southern Trench PowerPoint PDF |
|
January 10, 2007 |
Fuel Spill 28 Construction
Update PowerPoint PDF
Wind Turbine Update PowerPoint PDF
|
|
November 8, 2006 |
Fuel Spill 1 Update PowerPoint PDF
2006 Ashumet Pond Update PowerPoint PDF
Tumors in Brown Bullhead in Ponds near the Mass.
Military Reservation PowerPoint PDF
Update on Draft Notice of Intent for Partial
Deletion of Sites PowerPoint PDF
|
|
September 13, 2006 |
Ashumet Valley Feasibility
Study PowerPoint PDF
Ashumet Valley Optimization PowerPoint PDF
Fuel Spill 13 Source Area Decision Document PowerPoint PDF
IRP Plumes and Treatment Systems PowerPoint PDF
http://www.mmr.org/Community/teams/pct2/meetings.htmResidential Well Testing PowerPoint PDF |
|
July 12, 2006
|
Draft Notice of Intent for
Partil Deletion of Sites PowerPoint PDF
Chemical Spill-10 Source Area PowerPoint PDF
Southwest Operational Unit Update PowerPoint PDF
Chemical Spill-20 Plume PowerPoint PDF
Residential Well Testing PowerPoint PDF |
|
June 14, 2006
|
Future Agenda PowerPoint PDF
Ashumet Valley PowerPoint PDF
http://www.mmr.org/Community/teams/pct2/meetings.htmLandfill-1/Chemical Spill-23 Proposed Plan PowerPoint PDF
Fuel Spill-28 Update PowerPoint PDF
Chemical Spill-20 Leading Edge PowerPoint PDF
Landfill-1/Chemical Spill-23 Construction Update PowerPoint PDF
Southwest Operational Unit Update PowerPoint PDF |
|
May 2006 |
No Meeting Scheduled |
|
April 12, 2006 |
Peter's Pond Update PowerPoint PDF
Southwest Operational Unit Update PowerPoint PDF
Cost Overview PowerPoint PDF
Closure Criteria PowerPoint PDF
Source Area Update PowerPoint PDF |
|
March 8, 2006 |
Chemical Spill-10 Update Power Point PDF
Wind Turbine/Electric Use Power Point PDF
Ashumet Valley Plume Update Power Point PDF
Ashumet Pond Trophic Health Update Power Point PDF |
|
January 11, 2006 |
Chemical Spill-10 Update Power Point PDF
Chemical Spill-23/Landfill-1 Update Power Point PDF
Fuel Spill-28 Update Power Point PDF
Draft FS-1 2005 Hydrologic Assessment of Two
Ecosystems of Concern Technical Memorandum Power Point PDF
Southwest Plumes Access Update Power Point PDF
Ashumet Valley Drive Point Work Update Power Point PDF |
|
October 12, 2005 |
Ashumet Pond Phosphorus
Project Update Power
Point PDF
CS-10 Eastern Lobe Power Point PDF
Southwest Plumes Access Update Power Point PDF
Fuel Spill-28 Leading Edge Investigation Update Power
Point PDF |
|
|
Chemical Spill-10 Update
Backus River Sampling
CS-10 Feasibility Study Addendum
CS-23 Feasibility Study Alternative Analysis
Proposed Plan for the FS-12 Plume
FS-28 Leading Edge
Southwest Plumes Access Update
USCG-Exchange 3-in-1 Service Station Phase II
Results Summary |
July 13, 2005 |
CS-23 & LF-1
FS-12 Update
Proposed Plan for Groundwater at Eastern Briarwood,
Western Aquafarm and Storm Drain-5
FS-28 Leading Edge
Investigation Update
SWOU July 13 |
|
May 11, 2005
|
Final Draft Chemical Spill-19 Soils Engineering
Evaluation/Cost Analysis
Surface Water Sampling Plan, Pond Postings and
Residential Well Sampling
LF-1 Feasibility Study
Results
Fuel Spill-1 Plume Update |
April 13, 2005 |
Chemical Spill 10 Update
Initial Groundwater Remedial Alternatives for the
Ashumet Valley Feasibility Study
Remedial Alternatives for
the CS-23 Feasibility Study
Fuel Spill-28 2004 Leading
Edge Investigation Update
SWOU |
|
February 9, 2005
|
Landfill 1 Squeteague and Red Brook Harbor
Initial Groundwater Remedial
Alternatives for the Ashumet Valley Feasibility Study
Wetlands Way Forward CS-10
Detail F & SD-4
Ashumet Valley Plume Update
FS-12 Plume Boundary Comparison |
|
January 12, 2005 |
Backus River Update
CS-19 Groundwater Proposed Plan for Interim Action
CS-23 Remedial Investigation Update
Fuel Spill-28 2004 System
Performance and Ecological Impact Monitoring report March 2003 - March
2004
SWOU Photo
Plume Cleanup Team Review Responsiveness
Summary |
December 8, 2004 |
CS-19 Groundwater Proposed Plan for Interim Action
and Soil Excavation Update
Monitoring Discharge of the Phosphorus Plume
to Ashumet Pond
LF-1 Feasibility Study
Update
Sixth Extraction Well for the Southern Portion of
LF-1
Plume Cleanup Team Review Responsiveness
Summary |
|
October 13, 2004 |
PCT Fall 2004 Review
Human Health and Ecological
Risk Assessments Ashumet Valley IROD-to-ROD Project
Update on CS-10 Leading Edge Investigation
CS-19 Engineering Evaluation/Cost Analysis for
Source Removal |
|
September 8, 2004 |
Southwest Plumes Update
FS-12 2003 Annual Report
SD-5 2003 Annual Report
Initial LF-1 Remedial
Alternatives for the LF-1 Feasibility Study
Dura Matt Placement on Shorline |
|
August 11, 2004 |
Southwest Plumes Update
LF-1 Human Health Risk Assessment
Update on CS-10 Leading Edge Investigation
CS-19 Soil and Groundwater
Update
Ashumet Pond Geochemical Barrier Permitting
|
|
June 9, 2004 |
SW Plumes Wellfield and Treatment Plant
FS-12 Feasibilitiy Study Alternative Analysis (IROD
to ROD)
Multi-Plume Drive Point Sampling Results
CS-23 Data Update
Ashumet Pond Phosphorus Geochemical Barrier Project
Update |
May 12, 2004 |
Monitoring Locations in the Western Aquafarm Area
Quashnet River Sampling Locations
Plume Map
Monitoring Wells in the Eastern Briarwood Area
SWOU Photo
Human Health and Ecological
Risk Assessments Eastern Briarwood and Western Aquafarm
CS-19 Geophysical Investigation and Follow-on
Actions
LF-1 2003 Annual Report |
| April 14, 2004 |
SD-5 2003 Annual Report
Ashumet Pond Update - June 2003
CS-19 Geophysical Investigation and Follow-on Actions
Multi-Plume Data Collection Update
CS-23 Drilling Report
CS-10 2003 Annual Report
CS-10 Leading Edge Update
CS-10 New Data and Way
Forward
|
February 11, 2004 |
CS-4, CS-20, CS-21 and FS-29 Design/Construction Update
Work Plan for the Process
Leading to Final Remedial Decisions LF-1 and Ashumet Valley
FS-1 2003 Annual Report
FS-13
Source Area SSI Workplan
Multi-Plume Data Collection Update |
| January 14, 2004 |
CS-10 Update
LF-1 Update
Ashumet Valley Axial 2002
Annual SPEIM Report |
|
|
To
view meetings from previous years, please go to PCT
Meeting Archives |
|
|