Draft
Final Work Plan for the Process Leading to Final Ground Water Decision for Eastern
Briarwood, Western Aquafarm, Storm Drain-5, and Fuel Spill 12
The Public Comment Period for this document is from September 12, 2002 until September 25,
2002. Use the MMR Comment Form
to submit comments on this document.
Massachusetts
Military Reservation, Air Force Center for Environmental Excellence
Download entire Work Plan (except for Tables
and Figures, see below): 
The following are in PDF format by Section:
Table of
Contents
1.0 Introduction
2.0
Meeting the RI Objectives
2.1
Identification of RI Objectives
2.2 Fuel Spill-12
2.3 Storm Drain-5
2.4 Eastern Briarwood
2.5 Western Aquafarm
2.6 Evaluating Human Health Risks From Current
Site Contamination
2.7 Evaluating Ecological Risks From Current Site
Contamination
2.8 Risk Assessment Documentation
2.9 Applicable Guidance
3.0
Feasibility Studies
3.1
Development of Alternatives
3.2 Screening of Alternatives
3.3 Detailed Analysis of Remedial Alternatives
3.4 Community Involvement
3.5 Feasibility Study Review and Finalization
Process
3.6 Applicable Guidance
4.0
Proposed Plans and Public Comment Periods
4.1
Identifying a Preferred Alternative
4.2 Preparing Proposed Plans
4.3 Proposed Plan Review and Finalization Process
4.4 Public Comment Periods
5.0
Records of Decision
5.1
Selecting a Remedial Alternative
5.2 Preparing the Record of Decision
5.3 Responsiveness Summaries
5.4 Record of Decision Review and
Finalization Process
5.5 Applicable guidance
6.0 Schedule
7.0 References
Figures
Tables
| 2-1 |
History of the MMR and Fuel-Spill-12
Plume, Storm Drain-5 Plume, Eastern Briarwood Area, and Western Aquafarm Area |
| 2-2 |
Summary of References Containing the
Most Recent Data |
| 2-3 |
Standard Table 1, Selection of
Exposure Pathways FS-12 |
| 2-4 |
Standard Table 1, Selection of
Exposure Pathways SD-5 |
| 2-5 |
Standard Table 1, Selection of
Exposure Pathways Eastern Briarwood |
| 2-6 |
Standard Table 1, Selection of
Exposure Pathways Western Aquafarm |
| 2-7 |
Standard Table 4.1, Values Used for
Daily Intake Calculations, Groundwater - Adult |
| 2-8 |
Standard Table 4.2, Values Used for
Daily Intake Calculations, Groundwater - Child |
| 2-9 |
Standard Table 4.3, Values Used for
Daily Intake Calculations, Fish Tissue |
| 2-10 |
Standard Table 4.4, Values Used for
Daily Intake Calculations, Surface Water - Cranberry Worker |
| 2-11 |
Standard Table 4.5, Values Used for
Daily Intake Calculations, Surface Water - Adult Wader |
| 2-12 |
Standard Table 4.6, Values Used for
Daily Intake Calculations, Surface Water - Child Wader |
| 2-13 |
Standard Table 4.7, Values Used for
Daily Intake Calculations, Sediment - Cranberry Worker |
| 2-14 |
Standard Table 4.8, Values Used for
Daily Intake Calculations, Sediment - Adult Wader |
| 2-15 |
Standard Table 4.9, Values Used for
Daily Intake Calculations, Sediment - Child Worker |
| 2-16 |
Species-Specific Exposure Parameters
for Semi-Aquatic Receptors - River Habitat |
| 2-17 |
Species-Specific Exposure Parameters
for Semi-Aquatic Receptors - Pond Habitat |
| 6-1 |
Standard Schedule for Feasibility
Study Report |
| 6-2 |
Standard Schedule for Proposed Plan
and Public Comment Period |
| 6-3 |
Standard Schedule for Record of
Decision |
|
|