SD-5 Final Alternative Evaluation Matrix

  

EVALUATION CRITERIA

Proposed Alternatives

 

A

B

C

D

E

Y

Z

THRESHOLD CRITERIA              
I. Overall Protection of Human Health and the Environment              
A. Human Health              
1. Exposure pathways eliminated, reduced or controlled?

B. Environment              
1. Impacts on threatened/endangered species/habitats acceptable?

2. Impacts within hydrological and ecological threshold(s)?

II. Compliance with ARARs

PRIMARY BALANCING CRITERIA              
III. Effectiveness and Permanence of Response Alternatives              
A. Effectiveness              
1. Estimated % capture of plume by volume

2. Estimated % contaminant removal by mass              
a. Ethylene Dibromide (EDB)

b. Volatile Organic Compounds

c. Semi-volatiles

na

na

na

na

Na

na

na

d. Inorganics

na

na

na

na

Na

na

na

3. Impacts on other plume(s)

B. Impacts associated with uncaptured portion of the plume              
1. Human health risk              
a. Carcinogenic

b. Non-carcinogenic

2. Ecological risk

3. Socio-economic

4. Water supply

C. Characteristics of uncaptured portion of plume              
1. Volume

2. Mass

3. Persistence (duration)

4. Surface water impacts

D. Institutional controls for plume area              
1. Property use restrictions required

Na

2. Connections to public water supplies

Na

3. Adequacy of Institutional Controls              
a. Human health

b. Ecological

4. Other

na

na

na

Na

na

na

na

IV. Effectiveness of Treatment Systems              
A. Treatment system efficiency to background levels?              
1. Ethylene Dibromide

na

na

2. Volatile Organic Compounds

na

na

3. Semi-volatiles

na

na

na

na

na

na

na

4. Inorganics

na

na

na

na

na

na

na

B. Final disposition of treatment system residuals

na

na

C. Handling/treating/disposing of residuals: risks to workers

na

na

D. Treatment as principal element of response alternative?

V. Implementability              
A. Time factors:              
1. Duration to partial system start-up

na

na

na

na

2. Duration to full system start-up

na

na

3. Estimated duration of system operation

na

B. Reliability of technology

na

na

C. Coordination requirements with regulators/other agencies

D. Property access considerations

na

E. Risks associated with construction              
1. Human health

na

2. Ecological

na

F. Impacts associated with construction              
1. Socio-economic

na

2. Environmental

na

G. Risks associated with operations              
1. Human health

na

2. Ecological

na

na

H. Impacts associated with operations              
1. Socio-economic

na

2. Environmental

na

VI Cost, in millions              
A. Total capital cost

16.4

12.0

7.7

16.0

9.1

1.4

0

B. Operating and maintenance cost -- annual

1.5

1.1

0.8

1.4

0.8

0.2

0.1

C. Life-cycle cost

44.4

34.6

22.7

43.4

25.5

5.9

1.6

ACCEPTANCE CRITERIA              
VII. Acceptance of response alternative              
A. Public at large

B. Neighborhood

np

C. Process Action Teams

D. Senior Management Board Selectmen Representatives

E. Department of Public Health/ATSDR

np

np

np

np

np

np

np

F. Natural Resource Trustees

np

np

np

np

np

np

np

G Environmental Protection Agency

H. Massachusetts Department of Environmental Protection

I. Department of Defense

 

LEGEND: See supporting text for definition of each symbol in rating criteria. Generally, the solid circle represents a more favorable rating than the open circle.

Acceptance Criteria Ratings

Preferred

Acceptable

Unacceptable

np

No Preference