Bill Bearce of Jacobs
Engineering checks the in-flow meter at the Sandwich Road Treatment Facility. |
 |
Two workers inspecting header pipe (connected to a series of shallow wellpoint extraction wells) during construction of Fuel Spill 1 pilot test system. Pump house and treatment plant can be seen in background. |
| |
|
|
|
 |
Creating the access vault for an in-ground recirculation well. |
 |
Marking a box-turtle for identification (if found at a later date). |
| |
|
|
|
 |
Watering the hydroseed along the access road into the Landfill 1 (LF-1) treatment plant. |
 |
Clearing a new access road to the Landfill 1 (LF-1) treatment facility. |
| |
|
|
|
 |
Two crew members from Maher Drilling install a monitoring well in the Ashumet Valley area. |
 |
Blocking off a residential street with safety barrels to make a safety zone. |
| |
|
|
|
 |
Sampling the surface water of the Coonamessett River for pH, dissolved oxygen, and conductivity. The Fuel Spill 28 (FS-28) treatment plant discharge bubbler is in the foreground. |
 |
A fish ladder for herring constructed on the Coonamessett River by AFCEE. |
| |
|
|
|
 |
Creating a foundation for the Chemical Spill 10 (CS-10) in-plume treatment plant. |
 |
Trenching for a pipeline leading to the Chemical Spill 10 (CS-10) treatment plant. |
| |
|
|
|
 |
Looking upward towards the drilling mast. |
 |
Jim Snyder, former AFCEE Program Manager, receiving the Meritorious Civilian Service Award from AFCEE Director Gary Erickson for his work at MMR. |
| |
|
|
|
 |
Soil excavation at
Chemical Spill 10 (CS-10). These soils were
contaminated by semi volatile organic compounds (SVOCs), pesticides,
petroleum hydrocarbons and lead. |
 |
The Chemical Spill 10
(CS-10) site after excavation and backfilled with clean soil. |
| |
|
|
|
 |
Soil excavation at
Chemical Spill (CS-5) site. These soils were contaminated by
pesticides, petroleum hydrocarbons and lead. |
 |
Soil excavation at Fuel
Spill 9 (FS-9) site. These soils were contaminated by
pesticides, petroleum hydrocarbons and lead. |
| |
|
|
|
 |
The Fuel Spill 9 (FS-9) after excavation and backfilled with clean
soil. |
 |
Trenching for the
construction of a soil vapor extraction system (SVE) at Landfill 2
(LF-2). |
| |
|
|
|
 |
Soil excavation at the
Storm Drain 5 (SD-5) north site. These soils were contaminated
by lead, and metals such as chromium, copper and zinc. |
 |
Sandwich Road Treatment
System |
| |
|
|
|
 |
Ashumet Valley Treatment
System |
 |
LF-1 Treatment System |
| |
|
|
|
 |
FS-28 / Coonamessett Bog
Treatment System |
 |
FS - 12 Treatment System |
|
|
|
|
 |
FS-1 / Quashnet Bog
Treatment System |
 |
CS - 4 Treatment System |
| |
|
|
|
 |
CS- 10 Treatment System |
|
|
| |
|
|
|